At Mahabir Desizn and Construction Private Limited, our team thrives on building meaningful relationships with every client. Our architects, planners and engineers approach each project with patience, professionalism and a sincere desire to understand individual needs. We choose our team members based on skill, dedication and their ability to uphold our principles. With end-to end capabilities managed internally, we ensure consistency and accountability throughout the construction process. The motivation behind our work comes from seeing families step into homes shaped with care, trust and lasting value.

Before assigning the exact roles and responsibilities to the people mentioned, need clarity on what holds what within the company.

Board of Director

Mr. Arvind Singh

Chairman

Mr. Roshan A Singhh

Managing Director

Anjali Singh

Operational Director

Mr. Rahul Singh

( Project Executive )

Strength of Staff

Engineers 74 Nos
Civil Foreman 37 Nos
Supervisors 37 Nos
Electricians 34 Nos
Storekeepers 27 Nos
Safety In Charges 30 Nos
Mechanical Engineers 20 Nos

Our Client Project

S.No Client Name Work Type Area/Nos Location
1 Ambuja Cement Ltd. Residential Building
Ground + 4 floor
80,000 feet area Khavda
2 Ambuja Cement Ltd. Labour Colony 5,000 Capacity Khavda
3 Harmonic Filter Power Substation 1,2,3 Khavda
S.No Client Name Work Type Area/Nos Location
1 Mundra Solar Energy Ltd. Warehouse 5 Lakh feet area Mundra
2 Adani Green Solar Energy Ltd. Solar Energy 125 MegaWatt INC Mundra
3 PSS Power Substation 400 KVA & 600 KVA Mundra
S.No Client Name Work Type Area/Nos Location
1 Sterling and Wilson Energy Ltd. Solar Power
ICR, MCR, DWT
2.5 MegaWatt Khavda
2 Swathi Built Tech Private Limited (Makka International Factory)
Warehouse and Associated
10,000 sqft Madhya Paresh
Development Area (Boundary Wall, Road, Drain, STP, ETP, EPC etc.) – 300 Acres
3 Jaypee Infratech = Structure & Finishing (Multistoreyed Group Housing Project)
Tower KSI - 8,9 = 2B + G + 27 + Mumty and Machine Room (MMR)

List of Ongoing Project

  • PSS = 7

  • PSS = 4

  • Labour Colony

  • Sterling 92.5 MegaWatt

  • Swathi Build Tech Pvt. Ltd.

  • Reliance 100 MegaWatt (Multiple Location)

  • Wind Project

  • Balaji Hospital = 1 Lac foot

  • ATS = 50,000 sqft

  • Santosh Hospital = 15,000 sqft

  • Jaypee Residential Project = 300+

  • Delhi NCR Project = 58,125.12 sqft

  • Jaypee Infratech = Structure & Finishing (Multistoreyed Group Housing Project)

Tower KSI – 8, 9 = 2B + G + 27 + Mumty and Machine Room (MMR)